Unified Facilities Guide Specifications (UFGS) are a joint effort of the U.S. Army Corps of Engineers (USACE), the Naval Facilities Engineering Systems Command (NAVFAC), and the Air Force Civil Engineer Center (HQ AFCEC). UFGS are for use in specifying construction for the military services.
Note: On September 30, 2023, NASA officially withdrew from the UFGS program. The final NASA UFGS Master is available on the WBDG at NASA UFGS Master Specifications.
The UFGS are only published in electronic format and are intended to be used with SpecsIntact software; SpecsIntact supports the UFGS format. The UFGS Master complies with UFC 1-300-02.
Updated UFGS are posted quarterly in February, May, August, and November.
Read More
UFGS that have been unified for use by all participating agencies have a level 3 or level 4 Section number. The UFGS uses level 5 to identify a single-agency specification. The number "10" is used by USACE, "20" by NAVFAC, and "30" by AFCEC. The order of precedence for selecting UFGS sections for a project is generally:
Points of contact and procedures for the development and maintenance of UFGS documents are prescribed in the latest edition of MIL-STD-3007.
The UFGS Section Template is now provided in the UFGS Master with each quarterly release and can be found under Tools in the SpecsIntact Explorer.
Questions, comments, suggestions and recommended changes for guide specifications should be submitted as a Criteria Change Request (CCR). To submit, click on the CCR link next to the document title (below). CCRs are not appropriate when they pertain to a specific project solicitation, request for proposal, or after a project award. Questions or interpretations pertaining to these documents or situations should be referred to the Contracting Officer.
Click the 'Title' or 'Date' heading to sort by ascending or descending order. Narrow the list by selecting a 'Division' option from the drop-down or view archived documents by selecting from the 'Status' drop-down and clicking 'Apply'.
Active documents are available in the following formats: SpecsIntact (SEC) in compressed ZIP | Adobe Acrobat (PDF)
Archived release files are available in Adobe Acrobat (PDF) in compressed ZIP
Indicates the UFGS has an attachment. Click the title to view the attachment under 'Related Materials'.
Title | Date | View | CCR |
---|---|---|---|
UFGS MASTER | 08-15-2024 | ZIP | |
Unified Master Reference List (UMRL) | 07-01-2024 | ||
UFGS Changes and Revisions | 08-22-2024 | ||
UFGS Complete | 08-22-2024 | ||
UFGS Forms, Graphics, and Tables | 08-22-2024 | ||
UFGS Master Table of Contents | 08-22-2024 | ||
UFGS Section Template (Template CCRs Only) | 08-01-2024 | CCR | |
Division 00 - Procurement and Contracting Requirements | 08-01-2024 | ZIP | |
UFGS 00 01 15 List of Drawings | 02-01-2024 | PDF | ZIP | CCR |
Division 01 - General Requirements | 08-01-2024 | ZIP | |
UFGS 01 11 00 Summary of Work | 02-01-2024 | PDF | ZIP | CCR |
UFGS 01 14 00 Work Restrictions | 11-01-2022 | PDF | ZIP | CCR |
UFGS 01 20 00 Price and Payment Procedures | 11-01-2020 | PDF | ZIP | CCR |
UFGS 01 30 00 Administrative Requirements | 11-01-2020 | PDF | ZIP | CCR |
UFGS 01 31 20 Project Technical Data Management and Visualization | 05-01-2022 | PDF | ZIP | CCR |
UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) | 08-01-2023 | PDF | ZIP | CCR |
UFGS 01 32 01.00 10 Project Schedule | 08-01-2023 | PDF | ZIP | CCR |
UFGS 01 32 16.00 20 Small Project Construction Progress Schedules | 08-01-2018 | PDF | ZIP | CCR |
UFGS 01 32 17.00 20 Cost-Loaded Network Analysis Schedules (NAS) | 11-01-2023 | PDF | ZIP | CCR |
UFGS 01 33 00 Submittal Procedures | 08-01-2018 | PDF | ZIP | CCR |
UFGS 01 33 16.00 10 Design Data (Design After Award) | 05-01-2016 | PDF | ZIP | CCR |
UFGS 01 33 23.33 Aviation Fuel System Specific Submittal Requirements | 08-01-2018 | PDF | ZIP | CCR |
UFGS 01 33 29 Sustainability Requirements and Reporting | 02-01-2021 | PDF | ZIP | CCR |
UFGS 01 35 13 Special Project Procedures | 11-01-2020 | PDF | ZIP | CCR |
UFGS 01 35 13.43 10 Special Project Procedures for Contaminated Sites | 08-01-2015 | PDF | ZIP | CCR |
UFGS 01 35 26 Governmental Safety Requirements | 05-01-2024 | PDF | ZIP | CCR |
UFGS 01 35 29.13 Health, Safety, and Emergency Response Procedures for Contaminated Sites | 11-01-2015 | PDF | ZIP | CCR |
UFGS 01 42 00 Sources for Reference Publications | 05-01-2024 | PDF | ZIP | CCR |
UFGS 01 42 15 Metric Measurements | 02-01-2024 | PDF | ZIP | CCR |
UFGS 01 45 00 Quality Control | 08-01-2023 | PDF | ZIP | CCR |
UFGS 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) | 11-01-2023 | PDF | ZIP | CCR |
UFGS 01 45 35 Special Inspections | 05-01-2024 | PDF | ZIP | CCR |
UFGS 01 50 00 Temporary Construction Facilities and Controls | 11-01-2020 | PDF | ZIP | CCR |
UFGS 01 57 19 Temporary Environmental Controls | 08-01-2022 | PDF | ZIP | CCR |
UFGS 01 58 00 Project Identification | 08-01-2019 | PDF | ZIP | CCR |
UFGS 01 74 19 Construction Waste Management and Disposal | 02-01-2019 | PDF | ZIP | CCR |
UFGS 01 78 00 Closeout Submittals | 05-01-2019 | PDF | ZIP | CCR |
UFGS 01 78 23 Operation and Maintenance Data | 05-01-2023 | PDF | ZIP | CCR |
UFGS 01 78 23.33 Operation and Maintenance Manuals for Aviation Fuel Systems | 08-01-2018 | PDF | ZIP | CCR |
UFGS 01 78 24.00 10 Facility Data Requirements | 05-01-2023 | PDF | ZIP | CCR |
UFGS 01 78 24.00 20 Facility Data Workbook (FDW) | 05-01-2023 | PDF | ZIP | CCR |
UFGS 01 91 00.15 Building Commissioning | 05-01-2023 | PDF | ZIP | CCR |
UFGS 01 91 19 Building Enclosure Commissioning | 05-01-2023 | PDF | ZIP | CCR |
Division 02 - Existing Conditions | 08-01-2024 | ZIP | |
UFGS 02 32 13 Subsurface Drilling and Sampling | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 41 00 [Demolition] [and] [Deconstruction] | 08-01-2022 | PDF | ZIP | CCR |
UFGS 02 42 51 Carpet Removal and Reclamation | 11-01-2019 | PDF | ZIP | CCR |
UFGS 02 42 91 Removal and Salvage of Historic Construction Materials | 11-01-2018 | PDF | ZIP | CCR |
UFGS 02 51 19 Solidification and Stabilization Decontamination | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 53 16.13 Remediation of Contaminated Soils by Thermal Desorption | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 54 19.13 Bioremediation Using Landfarming | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 54 19.16 Bioremediation of Soils Using Windrow Composting | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 54 23 Soil Washing Through Separation/Solubilization | 02-01-2010 | PDF | ZIP | CCR |
UFGS 02 56 13.13 Geomembrane Waste Containment | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 56 13.16 Clay Waste Containment | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 56 13.19 Geosynthetic Clay Liner Waste Containment | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 61 13 Excavation and Handling of Contaminated Material | 02-01-2010 | PDF | ZIP | CCR |
UFGS 02 61 23 Removal and Disposal of PCB Contaminated Soils | 04-01-2006 | PDF | ZIP | CCR |
UFGS 02 62 13.00 10 Air and Steam Stripping | 08-01-2018 | PDF | ZIP | CCR |
UFGS 02 62 16.13 10 Operation, Maintenance and Process Monitoring for Soil Vapor Extraction (SVE) Systems | 08-01-2018 | PDF | ZIP | CCR |
UFGS 02 62 16.16 10 Commissioning and Demonstration for Soil Vapor Extraction (SVE) Systems | 08-01-2018 | PDF | ZIP | CCR |
UFGS 02 65 00 Underground Storage Tank Removal | 11-01-2022 | PDF | ZIP | CCR |
UFGS 02 66 13 Select Fill and Topsoil for Landfill Cover | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 66 16 Test Fill | 02-01-2021 | PDF | ZIP | CCR |
UFGS 02 81 00 Transportation and Disposal of Hazardous Materials | 11-01-2018 | PDF | ZIP | CCR |
UFGS 02 82 00 Asbestos Remediation | 11-01-2018 | PDF | ZIP | CCR |
UFGS 02 83 00 Lead Remediation | 11-01-2018 | PDF | ZIP | CCR |
UFGS 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury | 11-01-2022 | PDF | ZIP | CCR |
UFGS 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs) | 11-01-2022 | PDF | ZIP | CCR |
UFGS 02 85 00 Mold Remediation | 11-01-2018 | PDF | ZIP | CCR |
Division 03 - Concrete | 08-01-2024 | ZIP | |
UFGS 03 01 00 Rehabilitation of Concrete | 02-01-2018 | PDF | ZIP | CCR |
UFGS 03 11 19.00 Insulating Concrete Forming | 08-01-2022 | PDF | ZIP | CCR |
UFGS 03 23 00 Stressed Tendon Reinforcing | 05-01-2016 | PDF | ZIP | CCR |
UFGS 03 30 00 Cast-In-Place Concrete | 02-01-2019 | PDF | ZIP | CCR |
UFGS 03 30 53 Miscellaneous Cast-In-Place Concrete | 05-01-2014 | PDF | ZIP | CCR |
UFGS 03 31 29 Marine Concrete with Service Life Modeling | 05-01-2024 | PDF | ZIP | CCR |
UFGS 03 31 30 Marine Concrete | 05-01-2024 | PDF | ZIP | CCR |
UFGS 03 33 00 Cast-In-Place Architectural Concrete | 11-01-2009 | PDF | ZIP | CCR |
UFGS 03 37 00 Preplaced-Aggregate Concrete | 11-01-2009 | PDF | ZIP | CCR |
UFGS 03 37 13 Shotcrete | 02-01-2018 | PDF | ZIP | CCR |
UFGS 03 37 23 Roller-Compacted Concrete for Mass Concrete Construction | 11-01-2009 | PDF | ZIP | CCR |
UFGS 03 37 29 Concrete for Concrete Cutoff Walls | 11-01-2009 | PDF | ZIP | CCR |
UFGS 03 41 16.08 Precast Concrete Slabs (MAX. SPAN 8 FEET O.C.) | 11-01-2019 | PDF | ZIP | CCR |
UFGS 03 41 33 Precast Structural Pretensioned Concrete | 11-01-2016 | PDF | ZIP | CCR |
UFGS 03 42 13.00 10 Plant-Precast Concrete Products for Below Grade Construction | 05-01-2016 | PDF | ZIP | CCR |
UFGS 03 44 00 Reinforced Autoclave Aerated Concrete Panels | 02-01-2013 | PDF | ZIP | CCR |
UFGS 03 45 00 Precast Architectural Concrete | 05-01-2016 | PDF | ZIP | CCR |
UFGS 03 45 33 Precast [Prestressed] Structural Concrete | 05-01-2016 | PDF | ZIP | CCR |
UFGS 03 47 13 Tilt-Up Concrete | 08-01-2016 | PDF | ZIP | CCR |
UFGS 03 51 13 Cementitious Wood Fiber Decks | 05-01-2016 | PDF | ZIP | CCR |
UFGS 03 53 14 Light Reflective Nonferrous Metallic Aggregate Floor System | 08-01-2021 | PDF | ZIP | CCR |
UFGS 03 62 16 Metallic Non-Shrink Grouting | 08-01-2023 | PDF | ZIP | CCR |
UFGS 03 70 00 Mass Concrete | 02-01-2010 | PDF | ZIP | CCR |
Division 04 - Masonry | 08-01-2024 | ZIP | |
UFGS 04 01 20.73 Masonry Strengthening Using FRP Bars | 11-01-2015 | PDF | ZIP | CCR |
UFGS 04 01 20.75 Masonry Strengthening Using Surface Applied FRP Composites | 11-01-2015 | PDF | ZIP | CCR |
UFGS 04 03 00 Conservation Treatment for Period Masonry | 11-01-2017 | PDF | ZIP | CCR |
UFGS 04 20 00 Unit Masonry | 11-01-2015 | PDF | ZIP | CCR |
UFGS 04 23 00 Glass Unit Masonry | 11-01-2015 | PDF | ZIP | CCR |
Division 05 - Metals | 08-01-2024 | ZIP | |
UFGS 05 05 20 Post-Installed Concrete and Masonry Anchors | 05-01-2022 | PDF | ZIP | CCR |
UFGS 05 05 23.13 10 Ultrasonic Inspection of Weldments | 08-01-2018 | PDF | ZIP | CCR |
UFGS 05 05 23.16 Structural Welding | 08-01-2018 | PDF | ZIP | CCR |
UFGS 05 12 00 Structural Steel | 08-01-2018 | PDF | ZIP | CCR |
UFGS 05 14 00.13 Welding Structural Aluminum Framing | 11-01-2019 | PDF | ZIP | CCR |
UFGS 05 21 00 Steel Joist Framing | 05-01-2015 | PDF | ZIP | CCR |
UFGS 05 30 00 Steel Decks | 05-01-2015 | PDF | ZIP | CCR |
UFGS 05 40 00 Cold-Formed Metal Framing | 05-01-2015 | PDF | ZIP | CCR |
UFGS 05 50 13 Miscellaneous Metal Fabrications | 08-01-2024 | PDF | ZIP | CCR |
UFGS 05 50 14 Structural Metal Fabrications | 08-01-2018 | PDF | ZIP | CCR |
UFGS 05 50 15 Civil Works Fabrications | 08-01-2018 | PDF | ZIP | CCR |
UFGS 05 51 00 Metal Stairs | 08-01-2023 | PDF | ZIP | CCR |
UFGS 05 51 33 Metal Ladders | 08-01-2024 | PDF | ZIP | CCR |
UFGS 05 52 00 Metal Railings | 08-01-2023 | PDF | ZIP | CCR |
UFGS 05 59 10 Rolling Cover for Aviation Refueling Vaults | 11-01-2022 | PDF | ZIP | CCR |
UFGS 05 59 20 Fabrication Of Hydraulic Steel Structures | 05-01-2021 | PDF | ZIP | CCR |
UFGS 05 72 00 Decorative Metal Specialties | 08-01-2023 | PDF | ZIP | CCR |
Division 06 - Wood, Plastics and Composites | 08-01-2024 | ZIP | |
UFGS 06 10 00 Rough Carpentry | 08-01-2016 | PDF | ZIP | CCR |
UFGS 06 13 33 Pier Timberwork | 11-01-2016 | PDF | ZIP | CCR |
UFGS 06 17 19 Cross-Laminated Timber | 11-01-2016 | PDF | ZIP | CCR |
UFGS 06 18 00 Glued-Laminated Construction | 08-01-2023 | PDF | ZIP | CCR |
UFGS 06 20 00 Finish Carpentry | 08-01-2024 | PDF | ZIP | CCR |
UFGS 06 41 16.00 10 Plastic-Laminate-Clad Architectural Cabinets | 08-01-2010 | PDF | ZIP | CCR |